Español

In August 2009 a two axis tracker plant (connected since 2008) of 9,9 MWp in Ciudad Real was acquired. The plant has a total investment value of 79,8M€ and the equity investment reached 13M€ (Feed-in tariff RD/661).

Since its acquisition, the plant has produced 62.702 MW, saving CO2 emissions equivalent to 21.947 Tn during this period. This is equivalent to the total carbon footprint produced by 1.045 Spanish along the lifetime of the asset. Likewise, the production of the plant would cover the annual average consumption of over 5.225 families.

 

Eland Private Equity SGEIC S.A. © 2012 linkedinfacebooktwitter